In order to build the Accelerating Renewable Energy Integration and Sustainable Energy (ARESE) project funded by the World Bank,
the Maldives Ministry of Environment, Climate Change and Technology carried out power grid upgrade projects on 15 islands in the
Maldives.
The content of these engineering projects varies according to the circumstances of each island and includes everything from
upgrading the power lines of the distribution network to network segmentation, converting the low-voltage grid to a medium-
voltage (11kV) grid, installing automated substations, as well as feeder cables and Optical fiber optimization communication
ring network and other electrical projects. The PE threading pipe required for the project is provided by our company.